Email to us:

[email protected]
Home » Transformer » Three phase transformer » 0.4-38.5 kv three phase transformer

0.4-38.5 kv three phase transformer

0.4-38.5 kv three phase transformer product description: 0.4-38.5 kv three phase transformers adopt silicon steel sheet iron core which is made of excellent low loss crystal granule. They have the merit of low no-load loss, small no-load current an……

0.4-38.5 kv three phase transformer product description:

0.4-38.5 kv three phase transformers adopt silicon steel sheet iron core which is made of excellent low loss crystal granule. They have the merit of low no-load loss, small no-load current and low noise.

1. The height of sea level is less than 1000m.

2. Highest temperature 40ºC

3. Lowest temperature: -20ºC

4. Maximum daily average temperature: 25ºC

5. Maximum annual mean temperature: 20ºC

6. The relative humidity is less than 95%(when the sir temperature is 25ºC)

7. Install at the site with dust methane, but no explosion water

8. Power supply voltage profile approximate to sine wave

 

0.4-38.5 kv three phase transformer production video:

Three phase transformer product process

 

0.4-38.5 kv three phase transformer production display:

Three phase transformer core equipped with advanced three steps: vertical and horizontal and horizontal cut, lap and multi-stage. It disperses the air distribution, improve the magnetic path. Decrease the no load loss, no load current and noise.

Core adopts series measures dragged panel, pressed the coil, particular glue for silicon steel to increase the strength of mechanism.

Oil immersed distribution transformer

New structure of high and low voltage winding, reasonable arrangement for oil tube and connection which increasing the capacity of mechanical strength and anti-shortcut.

The tank is bell type or core suspension type, the wall of tank is as wave form.

 

0.4-38.5 kv three phase transformer FAQ:

1. Can I visit your factory?

A: Of course! You are always welcome to visit our factory!

2. Does your transformer have a power distribution cabinet?

A: No,We don’t produce distribution cabinets. If you need, we can contact relevant manufacturers for you.

3. How long is the lead tine and delivery time of the transformer?

A: After receiving the advance payment, the production cycle is 15-25 days. And the transportation cycle should be calculated according to your area and mode of transportation.

4. What certificates do you have for your transformers?

A: There are three ISO certificates for quality certification. The certificates will be shown later.

5. How long is the guarantee of the transformer?

A: We can provide a 14 month warranty!

 

0.4-38.5 kv three phase transformer certificate:

Established in 1958, ztelec has a complete production system and first-class production equipment. To ensure the quality of each product, we have produced a three phase transformer test report.

 

0.4-38.5 kv three phase transformer customer visit and praise:

We are a three phase transformer manufacturer, we are able to guarantee the quality of our products, deliver orders on time, and be able to customize transformers according to customer needs.

In April 2019, the Indian clients visited our transformer factory and ate distinctive Henan cuisine in China, establishing a long-term cooperative relationship.

Welcome friends from all over the world to visit the three phase transformer factory.

Releated Products

Dry type rectifier transformer

Cast resin phase shifting transformer

Vacuum cast coil dry type distribution transformers

Phase shifting rectifier transformer

Leave a message to us

If you are interested in our products, please feel free to contact us with [email protected]

Inquiry Email Whatsapp Chat Online